SOUTHWEST TRANSPORT INC
Risk factors
High riskVioCodes scoreA weighted read of the public FMCSA signals below — authority, insurance, out-of-service, crashes, roadside OOS rates, and carrier connections. A starting point for vetting, not a guarantee.
Roadside inspection performance
Out-of-service rate vs national average. Lower is better.
Company profile
FMCSA censusAUTHORIZED FOR HIRE
- Interstate · <100 mi10 drivers
- Company officer
- MIKE WALKER
- Operation
- Interstate
- Registered since
- 2002-02-22
- Last MCS-150 update
- 2009-08-17
- Census status
- I
Fleet: 10 trucks · 10 owned tractors.
Source: FMCSA Company Census File (data.transportation.gov). Fleet and driver counts are self-reported on the carrier’s most recent MCS-150 filing.
Data change history
Every FMCSA record change we’ve detected — address, fleet size, contacts, MCS-150 — newest first.
Activity history
9 events- 08/17/2009MCS-150 update filed
0.0M mi reported (2001)
- 08/14/2007Federal out-of-service order
90 day failure to pay fine
- 06/01/2007Insurance cancelled — GREAT WEST CASUALTY CO.
BIPD/Primary · policy GWP14048A
- 05/20/2003Insurance cancelled — CANAL INSURANCE CO.
BIPD/Primary · policy 383468
- 05/19/2003Insurance replaced — CANAL INSURANCE CO.
BIPD/Primary · policy 383468
- 10/09/2002Insurance cancelled — SENTRY SELECT INSURANCE COMPANY
BIPD/Primary · policy CT7691647001-011
- 09/01/2002Insurance replaced — SENTRY SELECT INSURANCE COMPANY
BIPD/Primary · policy CT7691647001-011
- 02/22/2002Registered with FMCSA
AUTHORIZED FOR HIRE
- 11/09/2001MOTOR PROPERTY CONTRACT CARRIER — GRANTED
OUT OF SERVICE (08/14/2007)
Merged from FMCSA authority, insurance, out-of-service, and census records.
Operations
Classification
- AUTHORIZED FOR HIRE
Area served
- Interstate
FMCSA safety rating
- Rating
- Conditional
- Type
- Compliance review
- Rated
- 2007-04-22
- Last review
- 2007-02-07
MCS-150 registration
- Form date
- 2009-08-17
- Reported mileage
- 30,561 mi (2001)
Got a violation you want to contest?
Use the free AI-powered DataQs Drafter to generate a polished challenge letter — quotes the relevant 49 CFR, predicts your grant chance.